A Silo Wall Is Loaded by Friction, Not by Depth
A grain wall is not a tank wall
Take a galvanized bin 6 m across and 18 m to the eaves, filled with wheat at 7.7 kN per cubic metre. The instinct is to treat it as a liquid and use depth times density: 7.7 times 18 is 138.6 kPa at the bottom. Grain is not a liquid. It carries shear on the wall, and that shear holds up most of its own weight. The horizontal pressure 18 m down comes out near 32 kPa, a little under a quarter of the hydrostatic answer. A bin sized on 138.6 kPa is overbuilt; one sized on 32 kPa without checking the vertical load is the one that folds.
Where the missing weight goes
Janssen's expression for a circular bin is p equals gamma R over mu, times one minus e to the minus mu K h over R. R, the hydraulic radius, is area over perimeter, a quarter of the diameter here, 1.5 m. Take K of 0.5 and a wall friction coefficient mu of 0.3 for wheat on galvanized sheet. Gamma R over mu is 7.7 times 1.5 over 0.3, or 38.5 kPa, and mu K over R is 0.10 per metre. At 18 m the exponent is 1.8, e to the minus 1.8 is 0.165, and the pressure is 38.5 times 0.835, about 32.1 kPa. The curve approaches 38.5 kPa and stops: doubling the height to 36 m buys barely 5 kPa more, where a liquid would double again.
The hoop stress is almost an afterthought
For a thin cylinder the hoop membrane stress is pressure times diameter over twice the wall. At 32.1 kPa, 6 m and 4 mm that is 32.1 times 6 over 0.008, about 24 MPa. The Q235 plate grade is named for its 235 MPa yield, nearly ten times what the ring needs. Even at 2 mm the figure is 48 MPa, and cold rolled galvanized coil with a published yield band of 140 to 300 MPa clears it. Ring tension does not set this wall.
The vertical load is the one that buckles
The friction that relieves the pressure does not disappear. Vertical pressure at the floor is the horizontal value over K, 64.3 kPa, so the base carries 64.3 times 28.3 square metres, about 1,818 kN, out of 3,919 kN of grain above it. The remaining 2,101 kN has gone into the wall as downward drag. Round a perimeter of 18.85 m that is 111 kN per metre, or 28 MPa of axial compression in 4 mm plate. An ideal cylinder buckles at 0.605 E t over R, roughly 161 MPa at 200 GPa; weld peaking and out-of-roundness cut that to a fifth, near 32 MPa. The wall sits at 28 against an allowable 32. At 3 mm the drag alone reaches 37 MPa. This is why silo shells fail in a diamond buckle just above the hopper, not in a hoop split.
Corrugation helps one way and not the other
Corrugated sheet looks like the cheap answer. The page is right that ridges and valleys add rigidity against bending, warping and buckling, and for a profile in gauges from 0.19 up to 2 mm and widths reaching 2,500 mm that stiffness is real across the sheet. It is horizontal bending stiffness. Under axial compression a corrugated sheet is a bellows: the folds close up rather than carry load, and the squashing stiffness falls below flat plate of the same gauge. Perforated panels go further still. For a bin of any height, either the corrugations are tied by stiffening rings or the shell is plain plate.
Eccentric discharge is what actually breaks bins
Everything above assumes the grain comes out of the middle. Draw off from one side and the pressure there can double while the opposite wall unloads. The ring goes from uniform tension to bending, and its compressed side is where a buckle starts. Add that bending to the 28 MPa of drag and a wall that passed the symmetric check is past its defect-reduced limit. The elephant's-foot bulge at the shell-to-hopper joint is a compression-and-bending failure, not a pressure failure. A steel structure material list with knee braces and tie tubes names the restraint that stops it; the bin needs a ring beam at the transition and a discharge pattern in the operating manual.
The cone is a different calculation
A hopper converges, so meridional force per unit length climbs as the radius shrinks. At a 0.5 m outlet carrying the 1,818 kN that reaches the floor, a 60 degree cone sees roughly 660 kN per metre, 165 MPa in 4 mm plate, close to yield and well past buckling. The cone also pulls inward, putting the transition ring into circumferential compression. That ring is rolled on a bending line and welded in place; it is structural, not trim. Punched bolt holes for the cone panels need deburring, because a sharp hole edge is where a crack in a cyclically filled bin starts.
What the coating has to survive
A silo is filled and emptied on a cycle that scrubs the wall. Z275 coil, published at 30 to 275 g per square metre in 0.12 to 2.0 mm thicknesses, is the starting point; the SGCC sheet programme runs 30 to 600 g per square metre at 0.12 to 6.0 mm for heavier courses. Electro-galvanized SECCN2 at 40, 60 or 80 g is thinner by an order of magnitude and belongs indoors, not against wheat. Where the product is wet or fertiliser-laden, a coat that is 55 per cent aluminium, a little under 44 per cent zinc and roughly 1.6 per cent silicon, or a 316L liner with 2 to 3 per cent molybdenum, earns its place.
The catalogue already lists this duty
One corrugated board page names grain storage and transportation alongside agriculture, which is the application line this wall is bought for. The ST02Z sheet advertises a 1,000 mm coil with 880 mm effective width and an anti-fire classification under GB50222-95; effective width, not nominal, sets how many sheets go round a 6 m circumference. Heavy courses come off the Q345 plate programme. Laser cutting, bending, welding, polishing and zinc coating are offered as one chain, which is how a bin with a cone, a ring beam and bolted courses is made.
Write the fill pattern into the order
Give the diameter and straight-shell height, then bulk density, internal friction angle and wall friction coefficient; those three set the pressure curve. Say whether discharge is central or eccentric and how many outlets. Step the wall thickness by course instead of buying one gauge for 18 m. Fix the stiffening ring spacing and the transition ring section. State the zinc mass on both faces and the finish on cut edges, and order the galvanized plate and cut blanks on the same delivery. A mill certificate quotes yield strength and coating mass. Neither says what the wall does at 111 kN per metre of drag, and that is what keeps the bin round after five harvests.