A Beam Does Not Fail at First Yield
The number on the drawing is a beginning
A six metre welded H beam in Q235, built from two 200 by 10 flanges and a 180 by 6 web, is usually quoted against an elastic bending limit. Work that limit out and a central point load of 61.2 kN is where the outer fibre reaches 235 MPa. Beyond that number most order sheets stop. Load the same beam to 67.2 kN and it finally forms a mechanism and comes down. The gap between those two figures is small on a simply supported span, but it is real, and on a restrained span it becomes large. The frame schedule puts Q235B and Q355B into the main column and beam lines, with C and Z purlins, knee braces and circular tie tubes alongside, so the shop already builds sections that behave this way. A buyer reading only the elastic figure has paid for capacity the calculation never claimed to exhaust.
Two section moduli, not one
The elastic modulus of the section is the second moment divided by the distance to the extreme fibre. For the 200 mm deep section above, the second moment is 39.05 million millimetres to the fourth, giving 390,493 cubic millimetres. The plastic modulus is a different sum: it is the first moment of the upper half about the neutral axis, doubled, and it comes to 428,600. Their ratio is 1.098. That is the shape factor, and it is the whole of the extra capacity on a simply supported beam. A solid rectangle of the same 5,080 square millimetres, 25.4 wide by 200 deep, gives 1.50 because it still has material near the neutral axis to yield. An H puts almost everything in the flanges, where it is already working hard at first yield. Sections like these come off a plate welding line, are cut from plate, and can be folded through 180 degrees or double-layer bends before assembly; the geometry is chosen, not inherited.
Where the reserve actually hides
On a single simply supported span the 9.8 per cent is all there is, because one hinge at midspan is enough to make a mechanism. Restraint changes the count. A beam fixed at both ends under a uniform load first yields at the supports at 30.6 kN per metre, but collapse needs three hinges, one at each end and one in the span, and virtual work puts that at 44.8 kN per metre. That is a 46 per cent gain, and it splits cleanly into two parts: 16 over 12, or 1.333, from redistributing the elastic moment diagram, multiplied by the 1.098 shape factor. Neither part is a stronger steel. A welded universal beam in Q235 at 5 to 34 mm and a hot rolled H section tested for mechanical properties reach the same limit by the same arithmetic.
Two spans buy more than one
Continue the beam over a middle support and the gain grows again. Elastic analysis puts the support moment at wL squared over eight, so first yield arrives at 20.4 kN per metre on two six metre bays. One release is enough to make the structure a mechanism only after a second hinge forms in a span, and the collapse load works out near 32.6 kN per metre, about 60 per cent above first yield. At that load the elastic support moment would be 146.8 kNm, but the section can only carry 100.7. The moment has to shed 31.4 per cent of itself into the spans, which is why a thirty per cent redistribution ceiling is such a common working rule. Uprating from Q235 plate to Q345 plate or to A36 structural plate raises both yield and plastic moment together and leaves the redistribution percentage almost where it was. The gain came from the continuity, not the grade.
The hinge has to turn without cracking
Redistribution is not free. A plastic hinge must rotate while holding full moment, and the rotation demand on a 200 mm section over a hinge length of roughly half the depth is about 0.022 radians, a little over one degree, at a curvature some twenty times the yield curvature. That requires elongation, not just strength. The structural galvanized sheet standard asks for yield point, tensile strength and elongation, and notes that only elongation needs a tensile test, which is a fair hint about which number governs a hinge. Hot rolled plate is preferred for load-bearing work because ductility and toughness are usually better than on cold rolled stock, and the general purpose H range in Q235B and Q345B is bought on that basis. A section that reaches yield and splits has no reserve at all.
Three details stop a hinge forming
Local buckling gets there first if the plate elements are too slender. The flange outstand here is 97 mm against a 10 mm thickness, a ratio of 9.7, while a fully plastic flange in 235 MPa steel wants something near 9 or lower. The web at 180 over 6, a ratio of 30, is comfortably inside its limit. Lateral restraint matters as much: an unbraced compression flange can twist away before the hinge completes its rotation, and a weak weld turns the joint into the failure point. Thin coated stock is the wrong material for this duty; the Z275 range is sold by zinc mass in grams, and rolled profiles for trims and sills belong elsewhere. Punched holes, sheared edges and surface treatment all land in the plastic zone on a real frame, so they belong on the drawing, not in a note.
What the shop needs on the order
Name the section by its four dimensions, not by a serial, and give the tolerance on each. Ask for a measured yield strength on the certificate rather than a grade label, and for elongation alongside it, because that is the number that permits a hinge. State the flange outstand to thickness and web depth to thickness ratios explicitly, give the spacing of lateral restraints near the supports, and specify the weld as full strength at the junction of web and flange. Mechanical cutting suits plate below 10 mm; heavier sections need a sound edge. The IPE 450 pattern in Q235, the 50 by 150 mild steel H beams and the hot dip galvanized H range are all stocked as sections, but the plastic calculation reads off the dimensions on the delivered piece.
What to put on the enquiry
Write four things down: the plastic modulus you designed to, the redistribution you assumed, the rotation capacity you need, and the restraint spacing that protects it. Then add the two numbers that make those possible, measured yield and elongation. A closed square section or a round stainless pipe carries a different shape factor again, and an A53 carbon pipe for structure is a different order entirely. First yield is a serviceability checkpoint on a continuous frame. Collapse is a mechanism, and the drawing should say which one it is buying.